As the PV industry shifts rapidly toward TOPCon and BC cell technologies, latent defects such as micro-cracks, broken fingers, passivation-layer anomalies and poor contact have become critical risks that undermine product yield and the long-term reliability of solar modules. As core quality-control equipment on the production line, an EL tester must comply with updated national and industry standards. At the same time, compatibility requirements and production-rhythm coordination must be considered for both newly built lines and the retrofitting of existing TOPCon lines to BC processes, so that inspection equipment does not become a bottleneck during technology upgrades. Drawing on China's EL-related standards newly implemented in 2026, this article outlines EL tester selection criteria for high-efficiency PV production lines and offers practical reference for module manufacturers worldwide.

 

1. The 2026 Regulatory Baseline: Dual Standards for Cells and Modules

Several PV inspection standards came into effect in China in 2026, establishing a clear compliance baseline for EL tester standards. The national guidance document GB/Z 46984.2-2026, Photovoltaic cells—Part 2: Electroluminescence imaging of crystalline silicon solar cells (published and implemented on January 4, 2026; issued by the Standardization Administration and the SAMR, under the jurisdiction of SAC/TC 90), addresses EL imaging at the un-encapsulated cell level. The electronics industry standard SJ/T 12013-2025, Test method for electroluminescence imaging of crystalline silicon photovoltaic modules (published September 9, 2025, effective March 1, 2026), covers indoor EL imaging at the finished-module level. Both adopt, equivalently (IDT), IEC TS 63202-2:2021. Together they define EL image acquisition conditions, defect evaluation rules, image output formats and data traceability requirements, and impose explicit constraints on infrared imaging resolution, dark-box light-shielding performance, excitation-source stability and MES communication interfaces. Manufacturers exporting overseas should also align with IEC TS 60904-13, the international reference for module-level EL imaging and reporting.

Table 1. 2026 China PV EL Standards at a Glance

StandardLevelAdoptionDate
GB/Z 46984.2-2026Cell-levelIDT IEC TS 63202-2:2021Effective 2026-01-04
SJ/T 12013-2025Module-levelIDT IEC TS 63202-2:2021Effective 2026-03-01
IEC TS 60904-13Module-level, international referenceInternational spec.In force (edition: 2018)

Note: GB/Z denotes a national guidance document; SJ/T is an electronics-industry standard. Both are equivalent (IDT) adoptions of IEC TS 63202-2:2021, covering the cell and module levels respectively.

 

2. Distinct Detection Logic for TOPCon and BC

TOPCon and BC, the two mainstream high-efficiency cell processes, require materially different detection logic from an EL tester for TOPCon and an EL tester for BC cells. TOPCon relies on a tunnel-oxide / poly-silicon passivation stack; its EL images are prone to uneven dark areas and grey-scale deviations induced by poly-Si process fluctuations. BC cells remove all front-side metal fingers and place every electrode on the rear side. Consequently, the EL excitation modes and defect-recognition algorithms traditionally optimized for PERC can no longer fully satisfy BC inspection. Higher demands are placed on the current-excitation range, the infrared camera dynamic range and AI defect sample libraries. Dedicated fixtures and excitation control units for rear-electrode modules are required to accurately identify BC-specific defects such as rear-side poor soldering, laser patterning defects and local recombination anomalies.

EL dective image

 

3. Retrofit Compatibility: Coordination Before and After the Upgrade

In existing-line retrofit scenarios, EL tester retrofit compatibility is essential. Many manufacturers are revamping TOPCon module lines to produce BC-compatible products; legacy EL devices with fixed hardware and embedded algorithms often fail BC inspection, forcing a complete replacement and raising capital expenditure. Three compatibility dimensions should be assessed at the procurement stage. First, mechanical hardware: conveyor width, module positioning mechanism and electrode fixture modules must support fast reconfiguration between front-electrode TOPCon and rear-electrode BC modules. Second, electrical excitation: the constant-current output range must cover the voltage-current characteristics of both high-efficiency module types. Third, software algorithms: the firmware must support iterative model updates with dedicated defect libraries for TOPCon and BC, while OPC UA and SECS/GEM industrial protocols enable seamless integration with the legacy MES system, guaranteeing complete traceability across the retrofit cycle.

 

4. Inline Deployment: Balancing Imaging Quality and Throughput

Under on-site mass-production conditions, an inline EL tester must match the line throughput while balancing imaging quality and efficiency. Dark-box light-blocking performance and infrared signal-to-noise ratio largely determine the detectability of micro-cracks and subtle process defects. Under 24-hour continuous operation, equipment stability, maintenance accessibility and vendor technical support are indispensable. Manufacturers should avoid decisions based solely on datasheet parameters. New BC-oriented lines are advised to adopt natively compatible EL systems; factories retrofitting existing TOPCon lines should prioritize upgradable hardware-software architectures to avoid redundant investment. For export-oriented projects, report formats and defect-judgment logic should satisfy both Chinese national standards and IEC international specifications, meeting the audit requirements of overseas customers.

 

5. Parametric Selection Checklist

The table below translates the above criteria into quantifiable line parameters for how to choose an EL tester for solar panel production. Manufacturers can calibrate the recommended range against their own production rhythm and module format; the values shown are typical references rather than fixed industry mandates.

Table 2. Parametric EL-Tester Selection Matrix

 
 
ParameterTOPCon LineBC LineRetrofit Line
Module formatM10 / G12 (182–210 mm)G12 rear-electrodeDual-format
Line takt (UPH)≥ 30 modules/h≥ 24 modules/hMatch incumbent
ExcitationConstant-current, adjustableBipolarReconfigurable
Camera dynamic range≥ 14-bit≥ 14-bit HDRUpgradeable
Dark-box shielding≥ OD 5≥ OD 5Retrofit kit
ProtocolsOPC UA + SECS/GEMOPC UA + SECS/GEMLegacy MES compatible
Defect libraryTOPCon dedicatedBC dedicatedIterative

Note: UPH = units per hour. Thresholds should be set against the actual line takt; the above are typical design values for reference only.

 

Industry specialists note that EL tester procurement is more than a simple equipment purchase—it is an integral part of the overall quality-management workflow. Full compliance with the 2026-updated standards, combined with the flexibility to support today's TOPCon mass production and tomorrow's BC migration, will maximize equipment lifecycle value and secure the outgoing quality of every module.

 

Appendix A: Weighted Selection Scorecard

This scorecard corresponds to the accompanying Excel file EL Tester Selection Scorecard and is intended for completion during EL tester selection criteria review meetings. Scoring range is 0–100, and total weight must equal 100%. Weighted score = weight × score; total weighted score = Σ(weight × score). The values below are examples based on typical operating conditions; the highest-scoring option is the recommended option.

 
 

No.

Criterion

Weight %

A

B

C

Weighted

Notes

1

Standard compliance: 2026 national standards + IEC (GB/Z 46984.2, SJ/T 12013, IEC TS 60904-13)

15

90

75

60

13.5

Mandatory threshold, veto item

2

TOPCon adaptation: uneven dark-area and grey-scale anomaly recognition, dedicated defect library

10

85

80

70

8.5

Required for TOPCon lines

3

BC adaptation: rear-electrode fixtures, rear-side poor soldering and laser patterning defect recognition

15

80

90

50

12.0

Critical for retrofit lines

4

Line takt matching: UPH and full-line synchronization capability

15

88

78

82

13.2

Calibrate with module format

5

Imaging performance: infrared resolution, dynamic range, SNR, dark-box shielding

10

85

88

65

8.5

Micro-crack detection

6

Excitation source: constant-current range covering TOPCon and BC I-V

10

80

85

70

8.0

Dual-process compatibility

7

Retrofit compatibility: conveyor width, positioning, fixture changeover, upgradeable hardware and software

10

70

60

90

7.0

Critical for existing-line upgrades

8

Communication and traceability: OPC UA + SECS/GEM, MES integration

5

90

80

75

4.5

Traceability before and after retrofit

9

Stability and after-sales support: 24h continuous operation, maintenance accessibility, iterative service

5

85

70

80

4.25

Full lifecycle cost

10

Total cost of ownership (including avoidance of redundant retrofit investment)

5

80

70

85

4.0

Lower cost scores higher

 

Total

=100

—

—

—

83.45

Total weight must equal 100; higher score is better

 

Overall (0-100)

 

83.45

78.75

70.30

 

Highest score is the recommended option

Notes: (1) Editable input fields are weights and scores (0–100) for each option. (2) Weighted score = weight × score; total = Σ(weight × score). (3) Standard compliance is a mandatory threshold; options that do not meet the 2026 national standards plus IEC should be eliminated. (4) Values are typical references; adjust according to your actual line takt and module format.

 

References

GB/Z 46984.2-2026, Photovoltaic cells—Part 2: Electroluminescence imaging of crystalline silicon solar cells — National Public Service Platform for Standards Information: https://std.samr.gov.cn/gb/search/gbDetailed?id=48438D1A4CF05363E06397BE0A0AD12F

SJ/T 12013-2025, Test method for electroluminescence imaging of crystalline silicon photovoltaic modules — China Electronics Standardization Institute: https://www.spc.org.cn/online/05c7ba49de32e272094405dfba63f6a4.html

IEC TS 63202-2:2021, Photovoltaic cells—Part 2: Electroluminescence imaging of crystalline silicon solar cells (IEC Webstore, adopted IDT by both Chinese standards above): https://webstore.iec.ch/en/publication/61734