Production Process of Photovoltaic Module Manufacturing
Release time:2025-02-07
Release time:2021-09-15
Author:
Author:
The quality and cost of solar cell modules directly impact the system's quality and cost. So, what does the production process of the modules look like?

Half-Cell Module: By cutting standard solar cells in half, each half-cell's working current is reduced, significantly lowering the resistance loss on the busbars, reducing the hot spot effect, and improving the module's conversion efficiency (CTM, Cell-to-Module) and overall performance.
The gap between the half-cells increases, and the light reflected from the backsheet through the glass onto the cells increases slightly. The higher the current of the cell, the greater the value derived from using half-cell technology.

The module production process generally involves seven steps: string soldering, lay up, lay up, framing, junction box installation, curing, and testing, before packaging and distribution into the market. Unlike full-cell modules, half-cell modules involve an additional cutting step, with the addition of a laser cutting machine to divide the cells. The string welding and lamination processes are then adjusted accordingly. At the cell level, the half-cell technology only requires modifications to the cell layout.
String Soldering
(Manual and Automated): Cells are soldered together with busbars, creating a series of connected cell strings. The key process controls are: cold soldering, overheating, cracked cells, and soldering tension.

The typical design for half-cell modules adopts a bifacial (two-part) design, where the upper and lower parts are connected in parallel, sharing a bypass diode. The output wiring changes from the top of the full-cell module (left image) to the middle, making it more suitable for vertical installation.
Lay up
Once the strings are connected and inspected, the module strings, glass, cut EVA, and backsheet are layered according to a specific order in preparation for lamination. The relative positions of the cell strings and materials like glass are adjusted, ensuring proper spacing between cells. The layer order (from bottom to top) is: glass, EVA, cells, EVA, fiberglass, backsheet.

Lamination
The layered components are placed in a laminating machine, where air is evacuated from the module using vacuum pressure, and heat is applied to melt the EVA and bond the cells, glass, and backsheet together. Finally, the module is cooled and removed. Lamination is a key step in module production, and the lamination temperature and time are determined based on the properties of the EVA used. (When using standard EVA, the lamination cycle time is about 10-15 minutes, with a curing temperature of 135-145°C.
Key process controls include: bubbles, scratches, dents, blisters, and cracked cells.

It is important to conduct strict appearance inspection and EL (electroluminescence)testing before lamination to ensure module performance and safety.


Framing
The framing protects the module's tempered glass edges and the laminated module, making it easier for installation in subsequent engineering processes.
Key process controls include: dents, abrasions, and scratches. Missing mounting holes, backsheet glue overflow, bubbles, and missing glue.
Junction Box Installation
The junction box connects and protects the solar module while conducting the electrical current generated by the module for use by the customer.
Curing
The sealant injected during the framing and junction box installation steps undergoes curing to enhance the seal and protect the module from adverse external environmental conditions.
Key process controls include: curing time, temperature, and humidity.
Testing
Electrical performance parameters are measured to determine the module's grade. The main tests include:
- Insulation Resistance Test — Tests the safety between the frame and the internal live parts (cells, busbars, etc.) under high voltage.
- Ground Continuity Test — Tests the resistance between the frame and ground to ensure good grounding performance.
- IV Test — Measures electrical performance parameters to determine the module's grade.